Skip to content

Project

Leeds Light Night

An eight-minute projection choreography on a modular steel-and-rope structure.
Visitors stand beneath an illuminated steel-and-rope structure at Light Night Leeds.

Photograph: Stefan Reiss.

01 / Experience

Eight minutes across twenty-six ropes.

O.T. 1191 is a large steel construction based on the letter A. Twenty-six mooring ropes stretch across one side and function as projection surfaces for an eight-minute choreography of monochrome and colour animation.

First presented at Light Night Leeds in 2023, the work uses Stefan Reiss’s third colour alphabet as the basis for its colour concept. An open, linear structure becomes the carrier of changing projected images.

Artwork title
O.T. 1191
Year
2023
Location
Light Night Leeds, UK
My contribution
Technical lead, prototyping, generative animation system, Production coordination, installation, mechanical design
Artistic authorship
Stefan Reiss
Commissioner
FORM
Context
Commission / artist collaboration
The projection choreography on the suspended ropes.

The projection choreography on the suspended ropes. Photograph: Stefan Reiss.

02 / My contribution

Bringing structure, animation and installation together.

I worked as technical lead across mechanical design, prototyping, the generative animation system, production coordination and installation. Mechanical development took much of the project time because it formed the basis for communication with manufacturers and contractors.

Leeds was the first instance of an assembly designed to be straightforward to transport and build on site. It served as a proof of concept for the later Amsterdam Light Festival design and construction planning.

Prototype

Develop and test the installation’s technical components.

Animate

Work on the generative animation system.

Install

Coordinate production and the on-site assembly.

03 / Construction

A modular frame with a clear geometry.

The A-shaped steel frame establishes the installation’s profile and supports its rope surface. Developing it as a modular assembly required considering its connections, handling, structural engineering and final geometry.

The first on-site build tested that approach in practice: separate components had to become a large, coherent structure at the festival site. The assembly experience supplied a basis for the subsequent transport and construction planning of other works.

Film & documentation

See the work in motion.

04 / On site

From delivery to the night-time image.

Transport and handling were a challenge of this specific installation. The frame assembly had to be moved from Leeds to Manchester by vehicle to quickly take its place within the site’s buildings and circulation routes.

Once installed, the steel and ropes provide a fixed arrangement for a composition that changes over time. The project film shows how the same physical elements support different visual states.

Architectural surroundings of Light Night Leeds

The frame within its architectural surroundings. Photograph: Stefan Reiss.

05 / Before & at the festival

Related project

Amsterdam Light Festival

Credits

Artistic authorship
Stefan Reiss

My contribution
Technical lead, prototyping, generative animation system, Production coordination, installation

Commissioner
FORM

Photography
Stefan Reiss (as credited with each image)

Video documentation
Project video: Stefan Reiss; Short clip: IMG_5426.MOV - Karsten Schuhl